Episcopal Cathedral
Site
Denver, Colorado
Installed
2011-2015
Team
The Arts & Architecture Commision: Chaired by David J. Rote
―
Re-imaging meeting spaces and public spaces for conversation and contemplation.
What we’ve accomplished:
1.
The Wellspring Center: Designed & Installed by David J. Rote in 2011. A suite of 3 rooms intended to have a cozy, traditional, residential feeling which is appropriate for the modestly scaled rooms in a gothic revival building. Existing and donated furniture mixed seamlessly new window treatments, and historic art collection.
2.
The Welcome Center: Designed by Committee in 2015. Removal of wal unit, painting, custom cabinets & credenza, recovering of historic sofa, New chair, tables & area rug from Bassett home Furniture.
3.
The Music Department: Coming Soon